Fabrication of Offshore DNV Container 2.7-1

Fabrication of Offshore DNV Container 2.7-1

OIL & GAS The fabrication of offshore container frames required the adherence to a strict Quality Assurance & Quality Control methodology which involves the following: Development of drawings in accordance with the DNV Code 2.7-1; Submission of the drawings to...
Demobilization & Mobilization of NORMAND MAXIMUS

Demobilization & Mobilization of NORMAND MAXIMUS

OIL & GAS SAIPEM-ZOHR field development project RUP Phase: Demobilization and Mobilization of NORMAND MAXIMUS (Solstad Offshore ASA) construction vessel by Multimarine Services Ltd on the behalf of SAIPEM at Limassol port, under the supervision and guidance of...
Offshore Welding Operations on Drilling Rig ENSCO 5006

Offshore Welding Operations on Drilling Rig ENSCO 5006

OIL & GAS The installation included the welding on the Rig’s deck of a base platform fabricated by Multimarine in the company’s Fabrication Facilities inside Limassol Port. Then, on top of the platform the ROV winch was secured. In addition, several fabrications...
Mobilization Of SAIPEM FDS

Mobilization Of SAIPEM FDS

OIL & GAS Our Fabrication team prepared the seafastening and fabricated the steel structures in advance in our facilities at Limassol Port. Our procurement department sourced and supplied steel material. Our Operations deptartment assessed, designed, prepared the...
D/S S10000 Tubular Recertification Services

D/S S10000 Tubular Recertification Services

OIL & GAS MAIN PROJECT DETAILS Project: HMF-H Marine Riser 10 Year Re-certification Start Date: April 2015 Completion Date: Ongoing Drilling Rig: SAIPEM 10000 Owner: SAIPEM OEM: GE Oil & Gas Riser Type: HMF-H Certifying Body: American Bureau of Shipping (ABS)...