Demobilization & Mobilization of NORMAND MAXIMUS

SAIPEM-ZOHR field development project RUP Phase: Demobilization and Mobilization of NORMAND MAXIMUS (Solstad Offshore ASA) construction vessel by Multimarine Services Ltd on the behalf of SAIPEM at Limassol port, under the supervision and guidance of Lead Operations Engineer Mr. Michele Terreni and Offshore Construction Manager Mr. Didier Michel.

OIL & GAS

SAIPEM-ZOHR field development project RUP Phase:

Demobilization and Mobilization of NORMAND MAXIMUS (Solstad Offshore ASA) construction vessel by Multimarine Services Ltd on the behalf of SAIPEM at Limassol port, under the supervision and guidance of Lead Operations Engineer Mr. Michele Terreni and Offshore Construction Manager Mr. Didier Michel on August, 2020.

1-    Our Fabrication team prepared the sea fastening and fabricated the steel structures in advance in our facilities at Limassol port.

2-    Our procurement department supplied the rigging and lashing equipment.

3-    Our engineering department performed all the required metrology.

4-    Our Operations department assessed, designed, prepared the lifting plans and executed safely and on time, the lifting, loading and transportation of:

  • VNM RHD 90t
  • S3000 RHD 110t
  • CT Deployment Frame 35t
  • CT Umb Reeel 35t
  • Fairlead 132t
  • JSM Buoy 100t
  • Diverter Sheone 38t
  • Wire rope reel 65t

5-    Our welding team completed the installation and securing the equipment on the deck.

6-    Our inspection team performed the NDT Inspection.

7-    Our Quality department supervised, prepared and submitted the required documentation.

 

Thank you SAIPEM for your continuous trust in Multimarine Services Ltd