OIL & GAS
Our Fabrication team prepared the seafastening and fabricated the steel structures in advance in our facilities at Limassol Port.
Our procurement department sourced and supplied steel material.
Our Operations deptartment assessed, designed, prepared the lifting plans and executed safely and on time, the lifting, loading and transportation of:
- 220t SAS winch from the quay side to the storage area.
- 50t DDMA
- 40t horizontal sheave.
Our welding team completed the sea fastening.