Seismic Vessel RAMFORM TITAN

Multimarine Services Ltd successfully completed several repairs on one of the most advanced seismic vessels in the world, PGS’s RAMFORM TITAN.

SHIPYARDS

Multimarine’s main task was the design, construction and installation on board of a lifting frame assembly with a trolley beam and chain trolleys to assist in the PEM Motor removal. Multimarine’s mechanics also participated together with the maker’s Field Service Engineers in the removal of the PEM Motor.

In addition to the above, Multimarine successfully completed the following tasks:

  • Welding and installation of new crane boom rest (Port and Stbd side);
  • Provision of scaffolding in the engine room, for repairs on the Sat Domes and for the crane repairs;
  • Boiler Repairs;
  • Load Testing of Work Boat Handling System with water load bags;
  • Underwater propeller polishing with diving crew;
  • Procurement Services.

Multimarine’s efforts contributed to the successful completion of a very complex project both safely and on time. This led to no project downtime, paramount to our client, PGS.