OIL & GAS
MAIN PROJECT DETAILS
Project: HMF-H Marine Riser 10 Year Re-certification
Start Date: April 2015
Completion Date: Ongoing
Drilling Rig: SAIPEM 10000
Owner: SAIPEM
OEM: GE Oil & Gas
Riser Type: HMF-H
Certifying Body: American Bureau of Shipping (ABS)
No. of Recertified Joints: 90ft Joints (52 pcs), 5ft Joints (2 pcs), 10ft Joints (2 pcs), 15ft Joints (2 pcs), 20ft (1 pc), 40ft (1 pc)
PROJECT DESCRIPTION
Multimarine Services Ltd is a GE Oil & Gas Approved Contractor for the Overhaul & Repairs (O&R) HMF-H Marine Risers.
In April 2015, Multimarine Services Ltd was appointed by GE Oil & Gas to complete the Full 10 Year Recertification of 52 x 90ft Riser Joints and 8 x Pup Joints of the D/S SAIPEM 10000. All works are being completed in Multimarine’s facilities in Limassol Port and include the following:
Handling, transportation and storage of the Riser Joints with an in-house fleet of Mobile Cranes; Joints
Provision of customized tools & complete disassembly of Riser Joints to component level
- Buoyancy Modules
- Hardware (thrust collars, threaded inserts, locking nuts, riser bolts, nose pins/seal subs)
- Auxiliary Lines
Traceability & Document Control
- Cleaning and preparation for Inspection
- High Pressure Water Cleaning (HPWC) at 250 bar
- High Pressure Water Jetting (HPWJ) at 1,500 bar
- Abrasive Blasting (angular, sharp shaped grit)
- Vacuum Abrasive Blasting (angular, sharp shaped grit)
- Soda Blasting
Full Non-Destructive Testing (as per SNT-TC-1A) & other methods of inspection
- Visual Testing (VT)
- Magnetic Particle Testing (MT) – colour contrast and fluorescent
- Liquid Penetrant Testing (PT) – colour contrast and fluorescent
- Ultrasonic Testing (UT) including wall thickness
- Phased Array Testing (PA) – Optional
- Eddy Current Testing (ET) – Optional
- Brinell Hardness Testing
- Positive Material Identification (PMI)
- Dimensional Testing
Repair and/or re-manufacture as required to restore compliance of failed components
- Auxiliary Lines – repairs and/or complete re-fabrication from new parts and pipe
- Main Tubes – cutting and welding of new pipe
- Buoyancy Modules – repairs
Methods of welding using approved Welding Process Specifications include:
- GTAW – manual
- GMAW – semi automatic
- SMAW – manual
- FCAW – semi automatic
- SAW – automatic
Hydrostatic Pressure Testing
Coating of Marine Riser, Buoyancy Modules & Hardware
- Surface dust assessment, surface profiling and dry film thickness measurements
- Application of approved Protective Coating Systems
- Galvanizing of hardware
- Phosphate Coating of hardware
Complete assembly of Riser Joints, maintenance and storage
Issue of CoC
Issue of Data Book for each Marine Riser Joint