112.8t PLET Transportation

The Heavy Lifting and Transportation Specialists at Multimarine Services Ltd safely transported within the DP World Terminal in Limassol Port a 24’’gas sales PLET (Pipeline End Termination) with total weight of 112.8t on behalf of TechnipFMC. The 24’’ PLET was offloaded from the SAL Heavy Lift Vessel KLARA.

Our Engineering department performed all the required calculations:

  • Design and structural analysis of the grillage
  • Structural analysis of the supports
  • Structural analysis of the trailer
  • Stability analysis of the trailer

Our Fabrication department performed:

  • Fabrication of steel grillage.
  • Fabrication of steel supports (stools)

Our Operations department:

  • Mobilization of the 14-axle multiwheeler.
  • Mobilization of the grillage and stools in place.
  • Transportation of the PLET from the quay side to the storage area.

And, our People carried out the operation safely to the full satisfaction of all parties involved.