| Date: |
26/01/2008 |
| Project Title: |
Lifting Operations, Load Testing, Ship Repairs & Supplies |
| Client: |
Gulf Agency Ltd |
| Vessel: |
MV Ocean Observer
|
| Description: |
Multimarine carried out the following services on the vessel:
-
Offloading from heli deck material / spares / equipment and transfer / load them on forecastle deck
-
Offloading from main deck material / spares / equipment and transfer / load them on heli deck
-
Cutting off the seafastening plates of a pipe rack on main deck and removing it at the quay side and then load it on heli deck
-
Removing all pipes from the pipe rack and then the support bars of the steel pipes from the side of the rack
-
Cleaning and grinding the deck in way of the old seafastenings
-
Welding a new pad eye on the A Frame (aft leg)
-
Welding two new prefabricated plates c/w nuts at the fwrd and aft of the A Frame (lower beams) for the locking screws of the A Frame sliding platform
-
Completing the welding of a prefabricated pipe rack frame and installing / welding it in a position on main deck alongside a container for placing spare pipes
-
Erection of scaffolding in way of the A Frame for access to the sheaves, pad eyes, pulleys, snatch block, etc
-
Carrying out load testings and visual functional testing and visual examination of the following:
-
40 off shackles (10te, 8,5te, 6,5te, 3,25te)
-
2 off NOIZ Arm Trip
-
3 off Fwrd and Aft A FRAME fall arrest pad eyes
-
Umbilical Poly Sheave
-
Wire Rope 13mm, 4m
-
Snatch Block
-
Turnbuckle
-
Dismantling and removing the scaffolding erected in way of the A Frame for access to sheaves, pad eyes, pulleys, snatch block
-
Supply of 2 off Hand Lift (pallets lift), capacity 3Te each
Multimarine was awarded the fabrication of crane cradles (2off pedestal and crutch) as per attached drawings
|
| [Back] |
|
|