Ship Repairs


Date:
22/05/2009
Project Title:
Pipes Renewal
Client:
-
Vessel:
MSC SEINE
Description:

Multimarine completed the following pipe fabrication as per the instruction of the vessel managers:

1. Fabrication of one 5" pipe with elbows using the old flanges after turning / machining of them

2. Fabrication one 2" pipe with one elbow 90deg and two pieces of pipes 400mm long each welded on the elbow at 90 degrees