Fabrications (Subsea & General)


Date:
19/03/2008
Project Title:
Maintenance of Twin Lattice Mast
Client:
VT Communications
Vessel:
N/A

Description:

Refurbishing the Twin Lattice Mast consisting of 8 mast sections in total, 6m long each section


Scope of Work Included:

1. Lowering the twin mast on the ground with the use of a crane and transport all sections at Multimarine's Yard


2. Gritblasting all 8 lattice mast sections and also all connecting brackets and all attached antenna mast clamps


3. Painting the sections


4. On completion transport the twin lattice mast at the salt lake site and installing it back in it's place with a use of a crane


[Back]

Other News

[Back]