Multimarine completed the fabrication of a tugger winch bracket and the installation on the vessel’s crane. The existing tugger winch bracket was taken to the Fab Shop and re-fabricated completely. On completion, the bracket was installed on the crane at the stbd side of the main support stiffener. This required the cutting and welding of new penetration pipes for cables and hoses.