Latest Projects


Date:
29/07/2008
Project Title:
Ship Repairs
Client:
-
Vessel:
MV ANTONIOS 1
Description:

Disconnection and removal from the engine room the following
pipes: 
1. One steel pipe 3" with two flanges, elbows and pipe
pieces of several lengths from the boiler pipe line below the tank
2. One heat exchanger pipe 11/4" with two flanges in a
coil shape made of copper, removed from inside the tank
3. One steel pipe 4" with two flanges, elbows and pipe
pieces of several lengths from a boiler pipe line 


Fabricating complete new pipes - pipes "1" and
"3"
Cleaning, pressure testing and welding the cracks / holes of pipe "2" 


On completion installing all new and repaired pipes in their
places inside the engine room with new gaskets, new bolts and new nuts