Date:
17/06/2008
Project Title:
Loading Operations
Client:
SPCM ROSETTA PROJECT
Vessel:
SIS ACE
Description:

1. Opening 3 open top containers x 40' and removing their covers for access to the items inside. After the removal of all contents closing the containers and fitting their covers back at the tops
2. Removing the contents (24 rectangular buoys) from all three 40' open top containers and loading them on the deck of SIS ACE
3. Use of crane and riggers for emptying the containers and loading all 24 buoys on board the vessel
4. Removing the contents from two other 20' containers (6 pallets of paint and 1 wooden box containing a machine) using forklifts
5. Offloading one empty 20' container from the vessel and placing it at the quay side using a crane
6. Stuffing inside the container all the contents removed from the other two containers using a telescopic forklift and riggers
7. Loading the container back on board using a shore crane