1. Removing the contents (rectangular buoys) from all three open top containers (total 24 buoys)
2. Loading all 24 buoys on the deck of MV SIS ACE
3. Opening the 3 open top containers and removing their covers for access to the items inside. After the removal of all contents closing the containers and fitting their covers back at the tops
4. Use of crane for emptying the containers and loading all 24 buoys on board the vessel