1. Repair the broken arm of one dredging bucket by welding the broken ends and also strengthening the arm by welding extra plates at the sides of the arm 2. Fabrication two stands as per instructions using square hollow sections 60x40x3 and 40x40x3
3. Preparation and welding extensions with stiffeners on one spreader frame using 2 off HEB200, 1500mm long and 2 off L100x100x10, 900mm long
4. Fabrication and welding 17 extra pad eyes on the spreader beams / frames as instructed